Here are 3 Steps to Take When Relocating a Manufacturing Facility

Written by Wall Street News on October 15th, 2019. Posted in Lean manufacturing engineering, Manufacturing plant floor plan, Process design and layout

Manufacturing is a major part of the United States’ economy, as it makes up 11.6% of the country’s GDP. With so many manufacturing facilities throughout the country, it’s understandable that at some point facilities will have to move to a new, and larger location. When this time comes, there are several steps that need to be taken during this process, and that’s what this article will be taking a look at.

  • Speak With Factory Layout Consultants: One of the first steps to take when relocating a manufacturing facility is to speak with factory layout consultants. There are many to choose from, as there are an estimated 684, 470 manufacturing consultants in the United States. They can provide expert advice on the best ways to conduct the relocation process, and it would be wise to consult with several experts before beginning the process.
  • Plan For Lean Manufacturing Engineering: Another step to take when relocating a manufacturing facility is to make plans for lean man